Pre-engineered metal building foundations · Florida
The steel arrives on a date. The bolts have to be right.
We set anchor bolts to your engineer’s layout, pour the slabs and grade beams under them, and hand over a pad that is ready to erect on. For general contractors across Florida — from a concrete company that has been pouring since 1978.
Everything downstream is waiting on this pour
A base plate either drops over the rods or it does not. When it does not, the fix happens with a crane on the clock and an erection crew standing next to it — field drilling, chipping, a grout detail nobody drew, and an RFI back to the engineer while the sequence slides to the right.
None of that shows up in the foundation bid. All of it shows up in your schedule. Which is why the number on a foundation package is worth less attention than whether the people quoting it read anchor bolt plans for a living.
What we pour
Anchor bolt setting
Rods set to the setting plan and held to ±1/8", templated and surveyed before the pour and checked again after. This is the work every other line on this page exists to protect.
Slabs, grade beams and footings
Monolithic pours, spread footings, continuous grade beams, isolated column pads and drilled piers — sized to your drawings and the geotech report rather than to a rule of thumb.
Sitework
Cut and fill, trenching, subgrade preparation and compaction. The pad is graded and compacted before any concrete is ordered.
Exterior concrete
Aprons, loading docks, access drives and hardstand — same crew, same mobilisation, rather than a second contractor after the building is up.
How a bid works
Send the set
Foundation plan, anchor bolt setting plan, and the geotech report if one exists. Include your steel delivery date — it tells us whether we can hold it, which is more useful to both of us than a number we cannot meet.
We take it off
Quantities come off your drawings. If we see something in the set that will cause a problem in the field, you hear about it with the bid rather than as a change order in month three.
You get a scoped proposal
What is included, what is not, and what we need from you and when. Written so it can be compared against the other bids on your desk without a phone call to decode it.
Bids go out within a week, and usually a day or two for contractors we have worked with before. If your schedule is tighter than that, say so when you call — you will get a straight answer about whether we can meet it rather than find out late.
Send it for a bid
Attach the drawings and say how to reach you — that is all it takes. No account, and nothing here is required except a way to reply.
Where we work
Florida, statewide. Most of this summer has been spent in West Palm Beach.
We will travel to Georgia, South Carolina and North Carolina for a project large enough to be worth mobilising for — usually several buildings on one site. If that is what you have, ask. If it is one building six states away, we will tell you so and save you the wait.
Not a brokered scope
PEMB Foundations is the metal building division of Oneco Concrete & Asphalt, a family-owned concrete and asphalt contractor in Bradenton, Florida, working Manatee and Sarasota counties since 1978. Jobs run from residential driveways to pours over a million dollars.
Robert Jeffers is a co-owner and the company’s General Contractor — licence CGC 1529759. The equipment, the crews and the fleet are Oneco’s, so the people who bid your foundation are the people who pour it.
Send us the set
Attach the drawings above, email them to bids@pembfoundations.com, or call and we will tell you quickly whether we are the right people for it.